Siemens Logo 10775065

Siemens Mobility

Moving people and goods safely and efficiently: light rail, high speed rail, street cars, rail automation, integrated services, electrification, infrastucture logistics, intelligent transportation systems.
498 Seventh Avenue 16th FL
New York, NY 10024
United States of America
(212) 672-4000
(212) 672-4001

More Info on Siemens Mobility

Siemens Logo 10775065

Moving people and goods safely and efficiently: light rail, high speed rail, street cars, rail automation, integrated services, electrification, infrastructure logistics, intelligent transportation systems.

Products

Airlink Radios enable wide-area, standard Internet Protocol connectivity – allowing railroads to transition from multiple, single-purpose networks to a common, managed, multi-...
June 6, 2023
The new hybrid trainset concept from Siemens Mobility features a hybrid battery car to accompany Siemens’ latest sustainable long-distance Charger locomotive.
May 31, 2022
Railroads can save costs and improve reliability by reducing the use of cellular and satellite connections.
May 31, 2022
Siemens
Velaro TR
One of the fastest high-speed trains in service, having reached a speed of 250 mph without modifications Cutting-edge technology comes from creativity and expertise Minimum service...
Sept. 20, 2016
Sept. 20, 2016
Stainless steel front Designed for hygienic area applications Easy-to clean widescreen Color display
Jan. 8, 2016
2 SMA ports for Wireless WAN Interface (4G/3G/2G) 4 x 10/100 Mbits/s ports (10/100TX) 2 x 1000 Mbit/s SFP ports (1000LX) 2 Serial Ports RS232/RS422/RS485 (DB9)
Jan. 27, 2015
Monitor and respond to traffic issues in real time.
Sept. 8, 2014
Get advanced traffic control software without the need to upgrade existing equipment.
Sept. 8, 2014

Press Releases

The Charger B+AC, which is designed to power trains at speeds up to 125 mph under catenary and on battery power for up to 100 miles, will be used in the MTA and Metro-North Railroad...
July 1, 2025
Siemens Mobility
A S200 LRV.
The order brings the total number of S200 LRVs in GCRTA’s fleet to 48.
March 4, 2025
Metropolitan Transportation Authority
MTA officials cut the ribbon on new SC42-DM locomotives
The new locomotives will travel much farther under electric power than the current P32 locomotives.
Nov. 5, 2024
Siemens Xcelerator technology uses an Integrated Data and Communication System to provide safer and more efficient rail travel for passengers.
May 31, 2024
Depot360 portfolio simplifies fleet electrification with Depot360 Managed Services and Depot360 Charging-as-a-Service.
May 6, 2024
CHSRA will be awarding a contract for its high-speed train sets by the end of 2024.
April 15, 2024
Siemens Mobility
cq5dam
This partnership will expand Siemens service contract with Metrolinx and increase system availability and reliability in Toronto’s passenger railway system.
March 28, 2024
The additional order of nine Siemens light-rail vehicles brings the total number of trains ordered to 45.
March 20, 2024
The addition of the eight S700 LRVs builds upon the current 28 S700 LRVs SacRT received from Siemens Mobility between 2020 and 2021.
Oct. 10, 2023
The order builds upon the initial purchase of 27 Siemens Mobility Dual Mode locomotives in 2020.
Sept. 27, 2023

Videos

Siemens Mobility, together with ViP Verkehrsbetrieb Potsdam GmbH, presented their research project on the world’s first autonomous tram on a 3.7-mile section of the tram network...
Sept. 20, 2018
Siemens recently completed the first Washington State Department of Transportation (WSDOT) Charger.
March 8, 2017
Sept. 12, 2015 – Thousands gathered to commemorate a new chapter in the region’s history as they caught the Orange, crossed the bridge and partied from Oak Grove to Portland (...
Sept. 17, 2015
Siemens new Amtrak train continues through testing as planners look to put the new trains into service on the northeastern corridor by fall 2013.
July 29, 2013
Siemens equips Paris metro line 1 with driverless metro system during ongoing metro operation.
Feb. 27, 2013
Brought to you by SmartDrive, this episode looks at Talgo's open house, the U.S. High Speed Rail Association's conference in San Francisco and the upcoming 7th annual Dump the...
June 1, 2012
Brought to you by Secured Cities, this cast looks at DART police's new texting program, AC Transit's hydrogen production and dispensing station and how the Cleveland RTA prepared...
April 20, 2012

Blogs

As a company that’s been working in transportation for nearly our 170 year history, with over 100 of those years in the U.S., we’ve seen a lot of changes in how Americans travel...
Jan. 23, 2017
Finding the delicate balance between budgetary issues, operational costs, lifespan, environmental concerns and future growth can be a daunting task that many transit agencies ...
Oct. 3, 2014
Despite Congress not properly funding high speed rail, several large projects are rapidly moving forward.
Sept. 25, 2014
Growing megacities and their megaprojects will require companies to cooperate with other companies, even though it might not benefit them in the short term.
Jan. 9, 2014
By leveraging new software and technologies to help bolster current, physical infrastructure, it's helping to create a competitive advantage in the 21st century global market ...
Sept. 5, 2013
US High Speed Rail Association’s HSR Conference brought representatives from around the world to share lessons learned and CHSRA's Dan Richards gives an update on the California...
Dec. 4, 2012
Experienced high-speed rail experts met with business and political leaders to discuss challenges and opportunities of bringing high-speed rail to the United States.
May 30, 2012
At the USHSR conference in San Francisco last week we toured the Siemens factory and the Transbay Transit Center. Andy Kunz kicked off the conference citing benefits of HSR and...
May 29, 2012

News

South Florida Regional Transportation Authority
A charger locomotive.
The locomotives are expected to enter service in 2029 to provide service into MiamiCentral.
Jan. 21, 2026
A group of stakeholders is pressing the chairman of the Senate Appropriations Committee and its ranking member to increase funding for the Northeast Corridor in the upcoming spending...
June 4, 2018
The Thameslink service used a system called automatic train operation (ATO) through central London.
March 27, 2018
The Ontario government has released its Hydrogen Rail Feasibility Study, which found that it would be feasible to build and operate electrified rail service on GO Transit and ...
March 5, 2018
Josh EnsignChief Operating OfficerProterraProterra announced Josh Ensign joined its management team as chief operating officer. A military veteran and former executive of Honeywell...
Nov. 16, 2016
With sleek railcars sliding along elevated tracks, South Korea's newest light railway is a smooth ride, and the hope is that it can avoid the fiscal train wreck facing similar...
June 20, 2012
Sacramento's Siemens manufacturing plant will build 18 of its S70 light-rail vehicles for TriMet in Portland, Ore., under a $73 million contract being announced today.
May 24, 2012
German manufacturer Siemens has promised to deliver new UK jobs after beating Bombardier to the Thameslink contract.
June 20, 2011
Siemens Industry Inc. today announced that it has been awarded a $17.2 million contract from Metropolitan Atlanta Rapid Transit Authority (MARTA), on behalf of the City of Atlanta...
May 20, 2011

Articles

In the second of a two-part series, vehicle design efforts to mitigate noise and vibration and the resulting effects on transit/passenger applications are further examined.
June 4, 2024
Brightline West
brightline
Through this new contract, Siemens will provide Brightline 10 AP 220 high-speed rail sets by 2028.
May 2, 2024
The trains are being manufactured by Siemens Mobility; the production of the trains are seeing more than 3,500 parts manufactured by nearly 100 suppliers in 31 states, as well...
Oct. 13, 2023
The line will not only connect south and central Florida, but it is being heralded as a bellwether for the future of passenger rail travel in the United States.
Sept. 25, 2023
The first-time grants were awarded through FTA’s Rail Vehicle Replacement Program, which targets replacement of aging rail cars responsible for service delays and increased maintenance...
May 8, 2023
Greater Cleveland Regional Transit Authority/Siemens Mobility
A conceptual rendering of future GCRTA high floor light-rail vehicles from Siemens.
The authority will initially purchase 24 Siemens S200 rail cars with options to order up to 60 rail cars.
April 19, 2023
The $220 million facility in Lexington, N.C., is expected to take two years to build and will enable Siemens to meet growing demand in the North American passenger rail market...
March 8, 2023

Contacts

Lauren Kraft

Communications Specialist

Request More Information From Siemens Mobility

By clicking above, I agree to Endeavor Business Media's Terms of Service and consent to receive promotional communications from Endeavor, its affiliates, and partners per its Privacy Notice. I also understand my personal information will be shared with the sponsor of this content, who may contact me about their offerings per their privacy policy. I can unsubscribe anytime.

Additional content from Siemens Mobility

The Level 2 AC charger is designed for all AC EV charger applications, including offices, hospitals, airports, school campuses and parking garages and lots.
Sept. 21, 2023
The first Amtrak Airo trainset is scheduled to debut in 2026.
Aug. 22, 2023
GCRTA's purchase of 24 LRVs includes an option for up to 36 additional vehicles, which would replace GCRTA’s Blue and Green Line fleet.
July 11, 2023
The new trains feature improved accessibility with wider aisles and areas for passengers using mobility devices, including wheelchairs and bicycles.
May 4, 2023
The new system will allow Brightline to optimally manage and maximize seat utilization for higher capacity and yields.
April 17, 2023
Arcadis
Arcadis
The $220 million facility project will break ground this summer, with operations beginning in 2024 on construction of a new rail car factory to manufacture rolling stock and passenger...
April 13, 2023
The GCRTA Rail Car Replacement Project Team made the recommendation based on the car style’s ability to bring new service alignments to the authority.
April 5, 2023
The new maintenance service contract will further strengthen Siemens Mobility’s ongoing relationship with Metrolinx while increasing the organization’s footprint in the greater...
Feb. 22, 2023
The station modifications are one part of the Light-Rail Modernization Project, which also includes adding a passing track to provide 15-minute service to Folsom area stations...
Jan. 31, 2023
Siemens’ Xcelerator is REGENT’s fundamental design, engineering and development platform.
Aug. 3, 2022
The trains, known as "Bright Green 2" and "Bright Pink 2," arrived at the railroad's Vehicle Maintenance Facility and will help carry passengers between south Florida and Orlando...
July 22, 2022