ERICO Rolls Out Solution for Testing Wayside Signaling

April 11, 2012
ERICO Temporary Rail Bonds connect exothermic and mechanical rail connections directly to the track wire, not to the rail. Compared to traditional methods, this helps save valuable testing time by eliminating the problems often encountered with connecting to rusty or greasy rail.

ERICO has developed an innovative solution for the testing and troubleshooting of wayside signaling and crossing signal applications. ERICO Temporary Rail Bonds connect exothermic and mechanical rail connections directly to the track wire, not to the rail. Compared to traditional methods, this helps save valuable testing time by eliminating the problems often encountered with connecting to rusty or greasy rail.

Temporary rail bonds are easy to connect and disconnect, and require no special tools for installation. They feature a tin-plated, solid bronze construction with stainless steel hardware, and are extremely durable and reusable. Available with a 5/16-incg hex nut (LPC508L) or 5/16-inch wing nut (LPC508LW).