| | | | | | | | | | To support the reopening, the CTA outlined several interim safety enhancements on the Yellow Line, including reduced speeds, track cleaning, enhanced operations communications and supervised operations. |
|
|
| | |
| |
| | |
|
|
| | | | | | | | Upgrades will replace the current train control system in the subway and extend the modern system to street-level SFMTA operation for faster, more reliable service. |
|
|
| | |
| |
| | |
|
|
| | | | | | | | The new service will be introduced as a train-to-train transfer at the Metrorail Transfer Station in Hialeah, Fla., where a shuttle train will spur out of the South Florida Rail Corridor into the Florida East Coast Railway for a direct service to MiamiCentral and back. |
|
|
| | |
| |
| | |
|
|
| | | | | | | | The project has also been approved for entry into the Engineering phase of project development under the FTA’s CIG program and represents a commitment from FTA to cover 50 percent of the anticipated total cost of the project. |
|
|
| | PRT closed the 150-year-old incline at approximately 7 p.m. on Jan. 2 following a malfunction that prevented the cars from slowing down and stopping at their predetermined positions at the upper and lower stations. |
|
|
| | In partnership with Boulder County, the cities of Boulder, Lafayette and Louisville and Denver RTD, the goal of the study is to develop a shared vision for the corridor by identifying current safety and mobility challenges and future opportunities to make the corridor more accessible for all road users... |
|
|
| | The work between the Dupont Circle and Gallery Place stations came in $250,000 under budget and service resumed one day earlier than planned on Dec. 30, 2023. |
|
|
| | Service was suspended from Dec. 8 to Dec. 23 to facilitate emergency inspection of the entire light-rail vehicle fleet. |
|
|
| | |
| |
| | |
|
|
| | |
|
| | |
|