Requesting Statements of Qualifications (SOQ) from firms with California SB/SB-PW/MB/DVBE or Federal DBE certification for: QA/QC OpenTrack Model, QA/QC OpenPowerNet model, and provide recommendations to resolve issues identified in model. Context: Static frequency converter-based, Closed-Mesh system, Static load integration via OCS, Distributed generation integration via OCS. Required: Experience with OpenTrack and OpenPowerNet. Must be available to participate between September to December 2024.
Project Name: Sustainability Program Management
Owner: CA High-Speed Rail Authority
Prime: Arup
SOQ Due Date & Time: September 24, 2024, 5 PM PST
For information on the availability of the scope of work or the prime’s policy regarding assistance to subcontractors in obtaining bonds, lines of credit, and/or insurance, please contact the project’s Small Business Officer (SBO).